Yadavaran Shalamcheh F C - définition. Qu'est-ce que Yadavaran Shalamcheh F C
Diclib.com
Dictionnaire en ligne

Qu'est-ce (qui) est Yadavaran Shalamcheh F C - définition

IRANIAN OIL FIELD
Yadavaran; Yadavaran Oil Field

Yadavaran Shalamcheh F.C.         
IRANIAN FOOTBALL CLUB
Yadavaran Shalamcheh
Yadavaran Shalamcheh is an Iranian football club based in Khorramshahr, Iran. They currently compete in the Iran Football's 3rd Division.
Yadavaran Field         
Yadavaran Field oil field is one of the NIOC Recent Discoveries which is located in Khuzestan, Iran.
C. F. W. Walther         
  • thumb
  • alt=
  • Portrait of an elderly Walther
FOUNDING PRESIDENT OF THE LUTHERAN CHURCH--MISSOURI SYNOD, LUTHERAN THEOLOGIAN, PUBLISHER
Carl Ferdinand Wilhelm Walther; C.F.W. Walther; CFW Walther; C. F.W. Walther; C F W Walther; Carl F. W. Walther; Walther League
Carl Ferdinand Wilhelm Walther (October 25, 1811 – May 7, 1887) was a German-American Lutheran minister. He was the first president of the Lutheran Church–Missouri Synod (LCMS) and its most influential theologian.

Wikipédia

Yadavaran Field

Yadavaran Field oil field is one of the NIOC Recent Discoveries which is located in Khuzestan, Iran.

The name is new, as the field is made up of two former fields, Koushk (discovered in 2000) and Hosseinieh (discovered in 2002). After researchers discovered that the two fields were actually connected, the field was renamed as the Yadavaran Field.

The field is estimated to have reserves of up to 17 billion barrels (2.7 km³) of oil, with 3 billion barrels (0.5 km³) considered to be recoverable.

On October 29, 2004, Iran negotiated a $70 billion deal with Sinopec, giving the Chinese company a 51% stake in the field's development. As part of the deal, China agreed to buy 10 million metric tons of liquefied natural gas (LNG) from Iran per annum for 25 years.

In December 2007, NIOC and Sinopec signed the final agreement for development of Yadavaran oil field. Based on the contract field will reach to the 180,000 bbl/d (29,000 m3/d) of production capacity. Sinopec will be operator with a 51% stake in the project and NIOC holding the remaining interest. Total project cost at around US$2 billion. In a third phase the field is expected to reach 300,000 bbl/d (48,000 m3/d) of production capacity.

The field will be developed under an enhanced Iranian buyback contract. The most significant revision in terms from earlier versions is that the partners will only agree the target capital cost of the development following receipt of construction tender submissions. This should reduce the contractors’ exposure to value erosion through cost inflation.

The oil field is currently at an early production of 16,000 bbl/d (2,500 m3/d) after 16 months development by the Chinese contractor.